HPC: does the race for raw power still make sense?

 

“For short journeys, choose walking or cycling, #TravelMoreSustainably”. Since March 2022, this line, or one of its variants, has been mandatory on every car advertisement in France. Manufacturers invest millions in developing a car, only to be required to remind people in their campaigns when to leave it in the garage: quite a paradox!

The car industry has always fuelled the horsepower race, only to end up driving at 80 km/h on our country roads. High-performance computing (HPC) is now running its own race, one measured in watts. And the question of consumption is just as pressing.

 

From megawatts to gigawatts

While a conventional supercomputer consumes in the order of a few megawatts, exascale systems, capable of a billion billion operations per second, now range between 20 and 40 megawatts. At the same time, AI Factories already exceed 100 megawatts, and Gigafactory projects are now counted in gigawatts.

That milestone has already been reached in Memphis, Tennessee, with xAI’s Colossus 2 AI cluster. Dedicated to training and running generative models such as the Grok chatbot, it draws close to one gigawatt of electrical power. The target is to reach 1.5 GW by 2027. One gigawatt drawn continuously amounts to almost 9 TWh a year. That is as much as the entire annual electricity consumption of Estonia, a country of 1.4 million people.

Moving fast means needing electricity immediately. At the Colossus site, xAI had 59 gas turbinesinstalled. Local residents and the NGO Southern Environmental Law Center have condemned their operation, all the more so as it took place without permits. Their emissions of nitrogen oxides and formaldehyde raise a major public health concern. When a single site concentrates the needs of an entire metropolitan area and competes directly with the local community for grid access and control over prices, energy trade-offs become critical: who will get priority tomorrow, and at what price?

 

Energy: a new limit for everyone

Energy is no longer unlimited. For any organisation that operates or buys computing capacity, energy is becoming a tangible limit, driven by three mutually reinforcing constraints.

The first comes from the components themselves. Their power consumption has soared in recent years, reaching more than 600 watts for CPUs and over 1,000 watts for GPUs, and the escalation is far from over. Packed into ever denser racks, they change the scale of a data centre’s requirements. A typical enterprise rack today draws around ten kilowatts, while a rack dedicated to AI can easily exceed 120 kilowatts.

The second concerns access to electricity. Having space in a data centre is no longer enough: you also need to bring in the necessary power. In the United States, a power generation project often takes more than five years from grid connection request to commissioning, and a power transformer takes 128 weeks to deliver on average. You can order a machine tomorrow without being certain you will have the electricity to run it.

The third is regulatory. In Germany, the Energy Efficiency Act (EnEfG) requires new data centres to achieve a PUE of 1.2: the building may consume only 20% more energy than the machines it houses. Existing sites must reach 1.5 by 2027, then 1.3 by 2030.

All in all, the energy consumed over a machine’s lifetime can cost as much as the hardware itself, rather like a car whose fuel ends up costing as much as the car.

 

What systems really deliver

Do such energy-hungry infrastructures actually run at full capacity? They are presented by their theoretical peak performance and ranked by their score on the Linpack benchmark, the TOP500 reference. Yet in practice, they fall well short of these figures.

Why? Three factors explain the gap.

  • I/O wall: it is a well-established fact that computing capacity is growing much faster than bandwidth, both in local memory and to storage.

  • Network bottlenecks: when a massive computation is distributed across thousands of nodes, each one must exchange its results and synchronise at every step. And the larger the cluster grows, the more the share of time spent on communication soars.

  • Code concurrency: any part of a program that cannot be parallelised sets a ceiling. This is Amdahl’s law: with 5% sequential code, you can never go more than 20 times faster, however many processors you use.

AI amplifies all three limits. Training a large model means spreading a single computation across thousands of compute nodes, which must synchronise their results at every step: the network becomes critical. The models are too large to fit in the memory of a single chip. AI chips keep computing faster, putting pressure on the rest of the infrastructure. 

 

Where we can act today

Two major levers can be pulled to meet this energy challenge.

The first is improving the energy efficiency of systems, through the widespread use of liquid cooling. The second is hybridisation, discussed below. Both should be combined with application-level power management.

But how these systems are run cannot be reduced to Flops per watt: the carbon footprint must be taken into account as a whole. That means favouring more local sourcing and manufacturing, running machines for longer and managing their end of life: genuine eco-design from the outset.

 

The right processor for each task 

Rather than chasing raw power by endlessly duplicating the same compute nodes, let us make the most of the diversity of technologies at our disposal.

That is the principle of hybridisation: combining different types of processor within a node or a single system, and giving each one the job it does best.

The GPU processes millions of data points in parallel, the AI accelerator excels at matrix calculations, and the quantum processing unit (QPU) could tackle certain simulation or optimisation problems beyond the reach of the others. The CPU remains the conductor: it prepares the data, distributes the work and gathers the results.

While the challenge is shifting to software, the tools themselves are mature. Whether proven workflows or hardware acceleration, the technological building blocks exist: the task now is to move to industrial, systematic integration. End users need guidance on who does what. They must be involved, but the software layers should orchestrate and simplify the deployment of these codes.

 

Measuring what the machine produces with Science Usage Efficiency (SUE)

Since 1993, the TOP500 has ranked supercomputers by their speed on a single benchmark, Linpack. The Green500 relates that same score to power consumption. On the data centre side, the following metrics have become standard: PUE for energy, WUE for water and CUE for carbon.

These metrics are essential, and at Bull we already use them to design our systems. But they describe the machine and the building, not the scientific results produced.

That is the question we want to put centre stage, with a metric we call Science Usage Efficiency (SUE): the amount of useful science produced per unit of energy. It builds on a concept familiar to researchers, energy-to-solution, but it counts results rather than operations. Naturally, these results depend on the field:

  • Molecular dynamics: nanoseconds simulated per megajoule, with codes such as GROMACS GROMACS is a molecular dynamics package mainly designed for simulations of proteins, lipids, and nucleic acids. or NAMD Nanoscale Molecular Dynamics is a computer software for molecular dynamics simulation.

  • Climate and weather: simulated years per megajoule, with IFS The Integrated Forecasting System (IFS) is a global numerical weather prediction system. or WRF The Weather Research and Forecasting (WRF) model is an advanced numerical weather prediction and regional climate modeling system.

  • Astrophysics and fluid dynamics: mesh cells resolved per joule, with OpenFOAM OpenFOAM is a software package and toolbox used for computational fluid dynamics and continuum mechanics simulations. or RAMSES RAMSES is an open source code to model astrophysical systems.

  • AI for science: tokens trained or inferences performed per joule

These measurements could be read like an energy label, from A to G, along the lines of the energy performance certificates sometimes used for homes. The same computation, run on a well-suited machine, would score an A. On an oversized, under-used machine, it would score an F.

For decision-makers, the benefit is threefold. SUE expresses performance in the unit that really matters: results. It makes it possible to compare very different architectures on the same use case. And it rewards software progress as much as hardware progress.

No single player can carry such a metric alone. It will require agreement on reference cases for each field and on common measurement rules.

Buyers have a key role to play here. The criteria written into tenders shape what the industry builds. Including science per joule among them gives the whole industry a common target.

The car industry eventually came to display fuel consumption next to horsepower, and to remind people, at the bottom of its posters, that walking is sometimes the better option. HPC could, in turn, display what its machines produce for every joule consumed. And perhaps one day we will see a small line appearing at the bottom of supercomputer adverts: “Before computing more, #ComputeSmarter”.